With waste generation steadily rising and local landfill space diminishing many waste transfer stations are approaching or operating at maximum throughput. Municipalities and transfer station owners are forced to consider the high cost of facility expansions or new construction and the long process of designing, permitting and building these facilities.
The mobile and self contained nature of GoodRock Capital Systems allows for immediate throughput increases with minimal or no facility modifications.
Outdoor land around the existing facility is converted to functional and efficient transfer space. The result is a minimum throughput amplification of 200 tons per day.
With safety being the number one priority GoodRock Capital engineers and staff are able to formulate the best plan to accomplish these capacity increases in an efficient and safe manner. |